Unpriced bill of quantities
A bill of quantities (BoQ) is an important document prepared by a quantity surveyor (or cost consultant) which itemises the type, form and amount of material that will be required on a project, including quantities of labour and other items. Quantities may be measured in number, length, area, volume, weight or time and are known as ‘measured quantities’.
A BoQ may be priced, in that prices are given by suppliers for each item. The sort of considerations that might be considered when pricing work include current costs of materials, machinery hire and transport, wages, overhead expenses associated with administration and so on.
In contrast, an ‘unpriced bill’ is a BoQ that is essentially a template: it breaks down the work required on a project into exact tasks but has no measured quantity (or price) by each task. The information is arranged into a form that is suitable for direct pricing by a supplier, describing the individual items to be priced and the numbers, amounts or quantities of each required for the project.
It is up to the company tendering for the project to insert against each task what it will charge the client to complete that task. This priced bill of quantities constitutes the tenderer's offer. It is the unpriced bill of quantities, but with the tenderer’s rates, costs and totals added.
The preparation, by the client’s consultants, of an unpriced bill of quantities means all tendering contractors will be pricing the same quantities (rather than taking-off quantities from the drawings and specifications themselves), and so provides a fair and accurate system for tendering. It also makes it possible to compare both the overall price and individual items directly with other tenderers’ offers, allowing a detailed assessment of which aspects of a tender may offer good or poor value. This information can assist with tender negotiations.
[edit] Related articles on Designing Buildings Wiki
- Approximate bill of quantities.
- Approximate quantities.
- Bill of quantities.
- Bill of quantities breakdown structures.
- Bill of quantities software.
- Common Arrangement of Work Sections (CAWS).
- Common mistakes in bill of quantities.
- Comparison of SMM7 with NRM2.
- Elemental bill of quantities.
- Firm bill of quantities.
- How to take off construction works.
- Measurement.
- New Rules of Measurement.
- NRM1.
- NRM2.
- NRM3.
- Standard Method of Measurement (SMM7).
- Taking off.
- Tender documentation.
- Tender pricing document.
- Uniclass.
- Working up construction works.
- Work package bill of quantities.
- Work section bill of quantities.
Featured articles and news
What it is and how to use it.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.